NHON HOI 2 URBAN ECOTOURISM
I. Surface area : 280.276m2
II. Construction detail
Ø The road system
Ø Rain drainage system
Ø Sewerage system
Ø Utility trench
Ø Green trees
Ø Electric lighting
Ø Electric supply
Ø Water supply
Ø Information system
Ø TSports equipment in the park
III. construciton time : From 15/10/2019 to 25/02/2020